Tempe Mechanical

3385 N. Nevada St.
Chandler, AZ 85225

Call Now (480) 820-1235

Education Projects

More Projects of Note: Industrial Office Hospitality/Restaurant Education Medical Municipal

Festival Foothills Elementary

Festival Foothills Elementary

Festival Foothills Elementary is a K–8 school in the Wickenburg School District. This was an interesting project, with extremely high ceilings in the gymnasium and a complex site. The project was completed in eight months, opening in January of 2008. The General Contractor on this project was Turner Construction.

Julia Randall Elementary

Julia Randall

Julia Randall Elementary School is located in Payson, Arizona. The school was constructed on a campus that was fully functional, with the old school being demolished once the new buildings were complete. This school uses a four pipe hydronic HVAC system, and it was all welded. The construction went through the winter months, and all of the associated challenges. The project was completed on time, and the school opened in 2009. The General Contractor was W.E. O'Neil Construction.

Midwestern University Student Housing PHS IV

Midwestern University

Midwestern University is located in Glendale. MWU added more student housing in 2009, and Tempe Mechanical performed the HVAC and Plumbing. The project was extremely fast paced, and the weather caused multiple delays. The project was completed on time with the help of every single trade. Chanen Construction was the General Contractor.